Nortel unwires business networks

Comms giant unveils "Unwired Enterprise" strategy

Written by Dave Bailey

Nortel has announced a plan to integrate so-called 4G wireless technologies like WiMax, Mesh and 802.11n into business network infrastructures.

Called the "Unwired Enterprise", Nortel is pointing to the costs and physical constraints of traditional office cabling as a driver for this move, as well as cost savings for firms using dual-mode (wireless and cellular) fixed mobile convergence (FMC) devices.

Nortel's portfolio leader for enterprise products Simon Wilson said that Nortel was stepping up its R & D efforts and working on in-house 802.11n technology. However, he pointed out that unlike some other enterprise wireless vendors like Colubris and Meru, Nortel would not be releasing products yet.

"The fact is these are all pre-N systems and from our engineers perspective, the standard is still not close enough for ratification to guarantee you won't need a hardware swap to be compliant," he added.

Wilson explained that Nortel have customers with large networks and campuses. "We're rolling out wireless to whole airports – and systems like these take anything between two and five years to roll out, so a technology break in the middle would be disastrous."

Currently Nortel is looking to launch 802.11n systems mid-2008, but if the standard ratification process moves quicker, the launch will be brought forward, the firm said.

As to the mesh component of the plan, Wilson said that Nortel had had a mesh solution for sometime, because "it's tough to backhaul" for large open areas where enterprises want wireless coverage.

"I'm talking about things like railway marshalling yards, and container ports where backhaul is challenging and could be dangerous," he added. "What we're talking about here is to integrate these new technologies into our mesh solution to form a coherent end-to-end system."

Nortel is linking its 802.11n rollouts with its WiMax developments and is having discussions with mobile operators about linking wireless LANs with WiMax systems. Asked whether the UK could see WiMax rollouts integrated with their other wireless systems, Wilson said, "This is a global announcement and obviously every country has their own regulatory approval process and their own spectrum [allocation policies]. Any restrictions on frequency in the UK may not apply in EMEA and the rest of the world."

Nortel is also not going down the route of a so-called 'overlay network', where wireless is just added, but not integrated fully, with the wired network. "We're integrating security and switching capability into our Ethernet switches at the edge and the core, because backhauling all the 802.11n traffic [which could be 20 x faster than current wireless speeds] to a security switch is not the way to go."

Wilson added that firms needed an intelligent network to differentiate between sensitive traffic, which may need backhauling to the security switch, and traffic like peer-to-peer traffic which may just need switching locally.

Tags:

reader comments

related articles

Nortel bets on 4G services by 2010

Nortel has exited the 3G equipment business to concentrate on next-generation 4G technology 11 Sep 2006

 

Nortel/Microsoft announce unified comms appliance

Deal will see Voip and PBX functionality integrated 19 Jan 2007

Unified comms competition increases

Cisco and Nortel both release updates to their core unified communications architectures 07 Mar 2007

Nortel shifts R&D funding to LTE

Robs WiMax to pay Long Term Evolution 16 Jun 2008

4g could hit home at 120Mbit/sec

Wimax forces cellular industry to consolidates around ultra-fast LTE technology - and femtocells could help deliver it 14 Feb 2008

Vendors tout 802.11n capabilities

Deliver fixed network performance without wires 21 Apr 2008

related whitepapers

today's top stories

Solid as a rock - business continuity in a global manufacturer

From power supply problems in Nigeria to email availability in Stockport, PZ Cussons is prepared for anything 02 Dec 2008

Technology and privacy

Watch the final video in a two-part Computing roundtable debate on the importance of putting data privacy issues at the heart of your IT plans 02 Dec 2008

IT staff desperate to keep their jobs

Most would work longer hours for less pay 02 Dec 2008

VMware View 3 enhances virtual desktops

Virtual clients now take up less storage space and can be 'checked out' to a laptop 02 Dec 2008

Technology and privacy

Watch part one of a two-part Computing roundtable debate on the importance of putting data privacy issues at the heart of your IT plans 01 Dec 2008

Advertisement

Newsletter signup

Sign up for our range of FREE newsletters:

Existing User

Newsletter user login:

Advertisement

Jobs

Related jobs

Job of the week

Job alerts

Sign up here

Find your next job

IT Salary Checker

Check salary here

Advertisement

White papers

Search white papers

Top categories

VPN, Extranet and Intranet Solutions

WAN/ LAN Solutions

Network Security

Interoperability-Connectivity

Grid/ Utility Computing

Latest poll

Will the terrorist attacks in Mumbai affect your offshoring plans?

Will the terrorist attacks in Mumbai affect your offshoring plans?

Is India becoming a risky destination?

Previous poll results

Latest audio and video articles

Padlocked CDVideo

Technology and privacy

Watch the final video in a two-part Computing roundtable debate on the importance of putting data privacy issues at the heart of your IT plans 02 Dec 2008

Podcast imageAudio

Computing podcast - Standard Life's offshoring plans; and the prospects for government IT

The insurance giant outlines its new outsourcing strategy; and we ask if the government's economic bailout will affect its IT plans 28 Nov 2008

Latest in-depth articles

Parcel being packedFeatures

Case study: eSpares and business continuity

Online electricals business has managed to decrease its downtime 02 Dec 2008

Royal Blackburn HospitalFeatures

NHS trust recovers from server overdose

Virtualisation technology breathed new life into East Lancashire's cost-intensive system 02 Dec 2008

Advertisement

Primary Navigation