To help IT professionals improve datacentre management while cutting costs and improving reliability and resiliency, Forrester Research offers the following tips:
Rationalise your application portfolio
The datacentre and its expensive and energy-consuming IT, power distribution and cooling equipment exists to support applications. And it’s not uncommon for applications to be severely under-used, which snowballs into IT infrastructure capital and operating expenses. Datacentre managers should liaise with users on the phasing out of severely under-utilised applications.
Consolidate and eliminate under-utilised servers
Datacentres are plagued with “dead” servers, or those with utilisation levels below six per cent, consuming power, cooling and space resources. Eliminating and consolidating these servers will free up capital and operating costs, and extend datacentre life by freeing up power, cooling and space capacity.
Increase your server virtualisation ratio
While nearly every organisation admits to virtualising servers, the savings potential from virtualisation is often not fully realised. Forrester finds that mature virtual production environments usually have about 30 virtual machines – and coupled with advanced automation tools, this could reach 50, without undermining service-level agreements.
Enforce “virtual first” policies for new applications
By stipulating that all new applications must run on virtualised infrastructure, you will benefit from improved disaster recovery and business continuity; rapid — or even automatic — restart of applications after an IT failure; and when used in conjunction with data replication between datacentres, it can restart applications at a recovery site following a primary site failure.
Increase storage utilisation and reclaim storage capacity
Storage environments are plagued with low utilisation rates and highly redundant data. IT professionals should consider thin provisioning and data deduplication technologies to improve utilisation and reclaim storage capacity.
Optimise your datacentre temperature
While manufacturers of IT equipment have set the allowable high-end temperature at 27°C, most datacentres are too cold, operating at 8°C to 20°C. With 60-70 per cent of datacentre energy consumption going to power and cooling, this represents a significant operating cost. Under supervision, turn up the temperature in your datacentre. For example, one IT manager took his datacentre temperature from 20°C to 23°C and recorded a 12.7 per cent reduction in energy use.
Doug Washburn is an infrastructure and operations analyst at Forrester Research.
Several Forrester reports are available free of charge to Computing readers by visiting www.forrester.com/computinguk.
Have your say on this article
Newsletters
Latest stories from Management
Latest videos
You may also like
Management jobs
Technology Patent Wars
Case studies from large organisations across all sectors
... And rich media, and flexible working, and peaks in traffic ...
Upcoming Events
Join us for this Computing web seminar, in which the Head of BI at the Co-operative Group Nick Colebourn will be explaining just how he reigned in the Group’s sprawling database estate and how significant savings were realised and data quality improved as a result.
Date: 31 May 2012
Time: 11:00 AM
Live June 13th 11:00am: Register now. During this web seminar we will be looking at the sorts of incidents that can bring data centres grinding to a halt and what can be done about them.
Date: 13 Jun 2012
Time: 11:00 am
Receive the latest jobs direct to your inbox
Are you being paid what you are worth?